Walk your yard before you order a backyard office: six checks on one plan
By the research desk, 18 Nov 2026. Sources read on 18 Nov 2026.
We earn nothing from the links in this post.
Before you order a backyard office, ask your city or county about setbacks; critical areas (such as wetlands, streams, landslide hazard and their buffers); the size at which a building needs a permit; and the power run. Call 811 about buried utility lines, and ask your homeowners association (HOA) or read your deed about covenants. Examples come from Federal Way (Washington), Fairfax County (Virginia), Prosper (Texas), a Washington State agency and the national 811 site, and rules differ by place.
What should you check in your yard before you order a backyard office?
- SetbackFederal Way (Washington) says a shed needs to be out of the required setbacks, usually 5 feet in the back and on the sides, to not require a building permit.
- Buried lineBuried lines: 811's site says to contact 811 before digging so that the approximate location of buried utilities can be marked with paint or flags.
- Critical areaFederal Way (Washington) says work in any critical area, including wetlands, streams, landslide hazard and their buffers, is not exempt from permits.
- Size and permitsFederal Way (Washington) lists one-story detached accessory structures, other than storm shelters, with a floor area that does not exceed 200 square feet.
- Private covenantsPrivate covenants: Fairfax County (Virginia) says many of its subdivisions are subject to covenants and deed restrictions.
- Power runThe power run: Washington's Department of Labor and Industries (L&I) says electrical work in Washington requires a permit and inspection, with a few exceptions.
Each numbered pin marks one check, in no set order. Setbacks are the required gaps a building keeps from boundaries such as the edge of the lot, and the power run is the cable from your house to the building. Which boundaries count, and where a city measures from, depends on your city.
City permit office
Who to ask: your city or county permit office, and 811 for the buried lines.
- Ask whether setbacks, critical areas, the size at which a building needs a permit, or the power run apply to your yard.
- Call 811 before any digging, and ask how long to wait in your state.
Source: federalwaywa.gov, 811beforeyoudig.com, fairfaxcounty.gov, lni.wa.gov. Checked 18 Nov 2026.
What setbacks does Federal Way (Washington) set for a shed?
Federal Way (Washington) says a shed has to be detached, freestanding and under 200 square feet to not require a building permit. It must also sit outside the required setbacks, usually 5 feet at the back and 5 feet at the sides. That is the rule for sheds, and the permit exemption list below words the size a little differently, so ask whether an office counts.
City permit office
Who to ask: your city's planning or permit office, since cities vary.
- Ask whether setbacks apply to a backyard office and where your city measures them from.
Source: federalwaywa.gov. Checked 18 Nov 2026.
Who do you call before you dig, and how much notice do you give?
- Notify 811Call 811 or make an online request a few days before you plan to break ground
- WaitA few days; check your state's specific requirement
- ConfirmAll utilities have responded to your request
- Digging near the marksTry to avoid digging on top of or within 18-24" on all sides of utility marks
811 is the national before-you-dig service. Its homeowner page says to wait a few days for locators to mark buried lines with paint or flags, and to check your state's specific requirement.
811 center
Who to ask: your state's 811 center.
- Call 811 before any digging, and ask how long to wait in your state.
Source: 811beforeyoudig.com. Checked 18 Nov 2026.
Does a small backyard building need a permit in Federal Way (Washington)?
Federal Way (Washington). Permit exemption list.
- Size and permitsOne-story detached accessory structures, other than storm shelters: floor area does not exceed 200 square feet
- Critical areasBuilding exception: any work in any critical area, including wetlands, streams, landslide hazard and their buffers, is not exempt from permits
- Other permitsUnless otherwise exempted, separate permits may be required for the exempted items
It depends on the city: Federal Way (Washington) has a list of residential permit exemptions that includes one-story detached accessory structures with a floor area that does not exceed 200 square feet, other than storm shelters. Work in any critical area, such as wetlands, streams, landslide hazard and their buffers, is not exempt from permits. The page adds that separate permits may be required for the exempted items, unless otherwise exempted.
City permit office
Who to ask: your city or county permit office.
- Ask whether an office of your size needs a permit, and whether part of your lot is a critical area.
Source: federalwaywa.gov. Checked 18 Nov 2026.
Does city approval cover homeowners association rules?
Covenants
- Prosper: verify covenantsProsper (Texas): check deed restrictions and homeowners association (HOA) covenants before applying for a permit; they may override Town rules
- Town does not enforceProsper (Texas): the Town does not enforce deed restrictions and/or HOA covenants
- Fairfax: many have covenantsFairfax County (Virginia): many subdivisions are subject to covenants and deed restrictions beyond the limits in the County's ordinances
- County does not enforceFairfax County (Virginia): these deeds and covenants are private agreements between property owners and are not enforced by the County
A city's approval is not the whole answer. Fairfax County (Virginia) and Prosper (Texas) each say covenants and deed restrictions can reach past local rules. A city or county that does not enforce covenants has not said you can ignore them, and rules differ by place.
Association or deed
Who to ask: your homeowners association. Where to look: your deed.
- Ask your homeowners association whether covenants apply to your lot, and read your deed.
Source: prospertx.gov, fairfaxcounty.gov. Checked 18 Nov 2026.
Does power to a backyard office need an electrical permit in Washington?
Washington, electrical work: rules from L&I
- Cities that run permitsIn a city that does its own permits and inspections, or in Tacoma Power's service area, you buy the permit and request the inspection from them
- Permit before startingYou must purchase a permit before starting any electrical work, with a few exceptions
- A city permitIf you obtained your permit from a city, contact the city electrical inspector to request an inspection
- Request inspectionNo later than 3 business days after completing the work or 1 business day after any part of the installation has been energized, whichever occurs first
- Do not cover itDo not cover any electrical work prior to inspection
L&I says electrical work in Washington needs a permit and inspection, with a few exceptions. Its page covers electrical work in general, so ask your city's permit office, or L&I where L&I permits the jobsite, whether a power run to a backyard building needs a permit and an inspection. Some Washington cities run their own electrical permits and inspections, and rules differ by state.
City permit office
Who to ask: your city's permit office, or L&I where L&I permits the jobsite.
- Ask whether your city does its own electrical permits and inspections.
- Ask whether a permit and an inspection apply, and who requests them.
Source: lni.wa.gov. Checked 18 Nov 2026.
Take this outside: six questions, one measurement and one habit
0 of 8 ticked
Common questions
Does a city enforce homeowners association covenants?
Two places say no: Fairfax County (Virginia) and Prosper (Texas) each say they do not enforce deed restrictions or covenants. That does not mean covenants do not apply: both places say covenants can reach past local rules. Rules differ by place, so ask your city or county.
Sources
Every source and the date we read it:
- My neighbor is building a shed in the backyard. What is allowed? | City of Federal Wayfederalwaywa.gov/faq/my-neighbor-building-shed-backyard-what-allowedRead 18 Nov 2026
- 811 Before you dig. Every dig. Every time.811beforeyoudig.comRead 18 Nov 2026
- Residential Permit Exemptions | City of Federal Wayfederalwaywa.gov/page/residential-permit-exemptionsRead 18 Nov 2026
- Zoning Requirements - What Can I Do With My Property? | Planning Developmentfairfaxcounty.gov/planning-development/zoning/faqsRead 18 Nov 2026
- FAQs - CivicPlus.CMS.FAQprospertx.gov/FAQ.aspxRead 18 Nov 2026
- Electrical Permits, Fees & Inspectionslni.wa.gov/licensing-permits/electrical/electrical-permits-fees-and-inspections/Read 18 Nov 2026
- 811 Information For Homeowners811beforeyoudig.com/for-homeowners/Read 18 Nov 2026
- Purchase Permits & Request Inspectionslni.wa.gov/licensing-permits/electrical/electrical-permits-fees-and-inspections/purchase-permits-request-inspectionsRead 18 Nov 2026
What we could not verify
- Rules, prices and terms change, and they differ by place. Each source shows the day it was read.
- The pages read for this guide cover: Federal Way (Washington); Fairfax County (Virginia); Prosper (Texas); Washington. They do not read your own city or county for you.
- Federal Way (Washington): The sentence does not say where setbacks are measured from.
- Sources that name no place: The page tells you to check your state's specific requirement for the waiting time.
- Washington: The page covers electrical work in general, and whether a cable run to a backyard building needs a permit is a question for the city, or for L&I where L&I permits the jobsite.
More conditions, by place (3)
- Federal Way (Washington): The page places this exception under its Building heading. The item is one entry on a list of residential permit exemptions for one city. The list is written for accessory structures in general, and how a city treats a backyard office is a question for that city. The FAQ is written about sheds. The FAQ says under 200 square feet and the exemption list says does not exceed 200 square feet, so the two pages word that line differently.
- Sources that name no place: The page offers this as advice.
- Washington: The page splits permits and inspections between the cities that do their own, Tacoma Power's service area, and L&I. The same page sends a permit from a city to the city's electrical inspector, and does not say whether this deadline covers it. The page lists three authorities: cities that do their own permits and inspections, Tacoma Power's service area, and L&I.
We have not bought, used or tested what this guide describes. It is research from the sources listed at the end, read on 18 Nov 2026.